CLIENT: Confidential Client
LOCATION: Morrisville, NC
DESCRIPTION:
Eno Company was engaged by a confidential client to assist with the installation of a new biokill skid. The purpose of the project was to capture and treat the lab waste in bulk. Eno was brought on board early to review existing conditions, make suggestions on layout of the skid, and ensuring that the new skid would operate correctly once installed. Utility connections included chilled water, domestic water, 480v power, 120v power, controls, lab waste, and vent. The project was completed successfully. Additionally, an FCU was also installed as part of the project to supplement with cooling within the existing utility space.